▶
Press the On/Off button.
The server is switched on, performs a system test and boots the operating
system.
In the case of configurations with a large memory size, the boot
process may be prolonged.
Switching the server off
The power-on indicator lights up green.
▶
Shut down the operating system properly.
The server is switched off automatically and enters standby mode. The AC
connected indicator lights up white.
If the operating system does not turn off the server automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal for power button override.
CAUTION
There is a risk that data may be lost.
Other On/Off options
Besides the On/Off button, the server can be switched on and off in the
following ways:
–
Timer-controlled turn-on/off
Using the ServerView Operations Manager or iRMC, you can configure that
the server is turned on/off controlled by an internal timer.
–
Ring indicator
The server is turned on by an internal or external modem.
–
Wake up On LAN (WOL)
The server is turned on by a command via the LAN (Magic Packet™).
–
After power failure
The server automatically reboots following a power failure (depending on the
settings in the BIOS or in iRMC).
Operation
RX2540 M6
Operating Manual
85
Summary of Contents for PRIMERGY RX2540 M6
Page 1: ...FUJITSU Server PRIMERGY RX2540 M6 Operating Manual Operating Manual English 08 2021 ...
Page 12: ...9 Warranty and service 121 Content Operating Manual RX2540 M6 ...
Page 14: ...Introduction 14 Operating Manual RX2540 M6 ...
Page 104: ...Troubleshooting and tips 104 Operating Manual RX2540 M6 ...