CX400 S2
Operating Manual
55
Starting up and operation
–
After power failure
The server node automatically reboots following a power failure (depending
on the settings in the BIOS or in BMC).
–
Power-on indicator override
The server node can be switched off (hard power off) by holding down the
On/Off button (approximately 4 - 5 seconds).
V
CAUTION!
There is a risk that data may be lost.
–
BMC
BMC offers various options for switching the server node on and off, e.g. via
the
Power On Off
page of the BMC Web interface.
V
CAUTION when turning the power off
(Windows Server 2008)!
The operation of the power switch can be specified as "Do Nothing", "Ask
me what to do" (only for Windows Server 2003), "Stand by", "Hibernate",
and "Shutdown" depending on the OS settings. The default is
"Shutdown".
On the server node, functions corresponding to "Stand by" and
"Hibernate" are not supported as BIOS and hardware functions.
For details about operating mode settings, refer to the manual supplied
with the OS.