BX620 S5
Operating Manual
33
Installing the hardware
Installing the Server Blade in the basic unit
Installing the Server Blade
V
CAUTION!
●
Follow the safety instructions and information in section
“Modules
with Electrostatic-Sensitive Devices” on page 24
.
●
The server blade boots automatically after installation in a
BX600 S3 basic unit with management blade S3.
If you install a BX620 S5 Server Blade in a BX600 S3 basic unit with
management blade S3 that is switched on, the server blade automat-
ically performs a Power On Self Test (POST), and then switches itself
off again.
The server blade must not be switched off during the automatic boot
process.
If the BX600 S3 basic unit is switched off when the server blade is
installed, the automatic POST is performed as soon as the basic unit
is switched on.