56
C141-C015
(3)
LVD ST Data Transfer
Figure 1.22 is the LVD ST Data Transfer measurement point.
*
*
**
**
** Use the crossing that yield the shorter Assertion Period
and Negation Period.
Figure 1.22 LVD ST Data Transfer measurement point
Notes:
1. V
N
- negated signal
2. V
A
- asserted signal
3. t
m
= 1.25ns minimum
4. V
A
or V
N
are required to drive the 100 mV at the leading edge of the transition. Those signals shall be at
least |100 mV| for at least t
m
before and after the transition.
5. Differential voltage signals in all cases.
6. t
af
and t
ar
shall be less than 3 ns.
7. Any signal structure may occur at the receiver while in the t
af
or t
ar
region including slope reversal.
Summary of Contents for MBA3300 NP SERIES
Page 6: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 69: ...C141 C015 63 Figure 1 26 ARBITRATION phase ...
Page 81: ......
Page 117: ...1 37 C141 C007 Figure 1 43 Bus phase sequence 1 of 2 ...
Page 118: ...38 C141 C015 Figure 1 43 Bus phase sequence 2 of 2 ...
Page 128: ...48 C141 C015 Figure 1 47 SPI information unit sequence during initial connection ...
Page 129: ...1 49 C141 C007 Figure 1 48 SPI information unit sequence during data type transfers ...
Page 130: ...50 C141 C015 Figure 1 49 SPI information unit sequence during data stream type transfers ...
Page 131: ...1 51 C141 C007 Figure 1 50 SPI information unit sequence during status transfers ...
Page 155: ...1 75 C141 C007 Figure 1 56 Connection to the LVD receivers ...
Page 161: ...Figure 2 1 Message format 154 C141 C015 ...
Page 166: ...Figure 2 2 SCSI pointer configuration C141 C015 159 ...
Page 201: ...This page is intentionally left blank ...
Page 205: ...This page is intentionally left blank ...
Page 207: ...This page is intentionally left blank ...
Page 208: ......
Page 209: ......