18
C141-C015
(2) BSY
(BUSY)
The BSY signal indicates that the SCSI bus is in use. In the ARBITRATION phase, this signal is
used to request for the bus usage priority.
(3) SEL
(SELECT)
The SEL signal is used by the INIT to select a TARG (in the SELECTION phase) or by the
TARG to reselect an INIT (in the RESELECTION phase).
(4) C/D
(CONTROL/DATA)
This is a combination of I/O and MSG signals, and specifies a type of information transferred on
the data bus. The C/D signal is always driven by the TARG (see Table 1.1).
(5) I/O
(INPUT/OUTPUT)
The I/O signal specifies the information transmission direction on the data bus. It is also used to
identify the SELECTION phase or RESELECTION phase. This signal is always driven by the
TARG (see Table 1.1).
(6) MSG
(MESSAGE)
A signal sourced by a target to indicate the MESSAGE phase or a DT DATA phase depending on
whether C/D is true or false. Asserted indicates MESSAGE or DT DATA (see Table 1.1).
Table 1.1
INFORMATION TRANSFER phase identification
Signal
C/D MSG I/O
Phase Direction
Comment
0
0
0
ST DATA OUT
INIT -> TARG
0
0
1
ST DATA IN
INIT <- TARG
ST Data phase
0
1
0
DT DATA OUT
INIT -> TARG
0
1
1
DT DATA IN
INIT <- TARG
DT Data phase
Data phase
1
0
0
COMMAND
INIT -> TARG
1
0
1
STATUS
INIT <- TARG
1
1
0
MESSAGE OUT
INIT -> TARG
1
1
1
MESSAGE IN
INIT <- TARG
MESSAGE
Summary of Contents for MBA3300 NP SERIES
Page 6: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 69: ...C141 C015 63 Figure 1 26 ARBITRATION phase ...
Page 81: ......
Page 117: ...1 37 C141 C007 Figure 1 43 Bus phase sequence 1 of 2 ...
Page 118: ...38 C141 C015 Figure 1 43 Bus phase sequence 2 of 2 ...
Page 128: ...48 C141 C015 Figure 1 47 SPI information unit sequence during initial connection ...
Page 129: ...1 49 C141 C007 Figure 1 48 SPI information unit sequence during data type transfers ...
Page 130: ...50 C141 C015 Figure 1 49 SPI information unit sequence during data stream type transfers ...
Page 131: ...1 51 C141 C007 Figure 1 50 SPI information unit sequence during status transfers ...
Page 155: ...1 75 C141 C007 Figure 1 56 Connection to the LVD receivers ...
Page 161: ...Figure 2 1 Message format 154 C141 C015 ...
Page 166: ...Figure 2 2 SCSI pointer configuration C141 C015 159 ...
Page 201: ...This page is intentionally left blank ...
Page 205: ...This page is intentionally left blank ...
Page 207: ...This page is intentionally left blank ...
Page 208: ......
Page 209: ......