1-29
C141-C007
(2)
MESSAGE OUT phase
In a MESSAGE OUT phase, the TARG requests to transfer message information from the INIT to
the TARG. The TARG keeps the C/D and MSG signals true and I/O signal false during
REQ/ACK handshaking in this phase.
The TARG executes this phase in response to the ATTENTION condition (described in Section
1.7.1) created by the INIT, and must remain in the MESSAGE OUT phase.
Note:
The TARG can terminate the MESSAGE OUT phase even when the ATN signal is true when
it returns a MESSAGE REJECT message to reject an illegal or invalid message, when it enters
the BUS FREE phase as directed by the received message, or when it returns a message
immediately in response to a received message (such as the SYNCHRONOUS DATA
TRANSFER REQUEST).
The TARG can process a received message immediately if no parity error is detected. If a parity
error is detected, the TARG shall ignore all messages which have been received after the parity
error detected in the MESSAGE OUT phase.
When the TARG receives all message information correctly without detecting a parity error, the
TARG shall enter the INFORMATION TRANSFER phase other than the MESSAGE OUT phase
and execute at least one byte of information transfer in order to request the INIT not to retry
message transfer. During some message transfer, the TARG may report the normal completion of
message reception by switching to the BUS FREE phase (for example, ABORT TASK SET and
TARGET RESET messages).
1.6.10 Signal requirements concerning transition between bus phases
If an SCSI bus is at an intermediate point of two INFORMATION TRANSFER phases (during
transition of bus phase), the interface signals must satisfy the following requirements.
a) The BSY, SEL, and ACK signals must not change.
b) The REQ signal must not change until it is asserted to qualify the start of a new phase.
c) The C/D, I/O, MSG and DB(15-0, P_CRCA, P1) signals may change.
d) Switching the DB(15-0, P_CRCA) signals direction from OUT (INIT driving) to IN (TARG
driving)
1) The transition of the I/O signal to true.
2) The TARG delays driving the DB(15-0, P_CRCA, and/or P1) by at least one Data Release
Delay plus one Bus Settle Delay after asserting the I/O signal.
3) The INIT releases the DB(15-0, P_CRCA, and/or P1) within one Data Release Delay
e) Switching the DB(15-0, P_CRCA and/or P1) direction from IN (TARG driving) to OUT
(INIT driving)
Summary of Contents for MBA3300 NP SERIES
Page 6: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 69: ...C141 C015 63 Figure 1 26 ARBITRATION phase ...
Page 81: ......
Page 117: ...1 37 C141 C007 Figure 1 43 Bus phase sequence 1 of 2 ...
Page 118: ...38 C141 C015 Figure 1 43 Bus phase sequence 2 of 2 ...
Page 128: ...48 C141 C015 Figure 1 47 SPI information unit sequence during initial connection ...
Page 129: ...1 49 C141 C007 Figure 1 48 SPI information unit sequence during data type transfers ...
Page 130: ...50 C141 C015 Figure 1 49 SPI information unit sequence during data stream type transfers ...
Page 131: ...1 51 C141 C007 Figure 1 50 SPI information unit sequence during status transfers ...
Page 155: ...1 75 C141 C007 Figure 1 56 Connection to the LVD receivers ...
Page 161: ...Figure 2 1 Message format 154 C141 C015 ...
Page 166: ...Figure 2 2 SCSI pointer configuration C141 C015 159 ...
Page 201: ...This page is intentionally left blank ...
Page 205: ...This page is intentionally left blank ...
Page 207: ...This page is intentionally left blank ...
Page 208: ......
Page 209: ......