Defrost Flow Chart
The defrosting shall proceed by the integrating operation time
and outdoor heat exchanger temperature as follows.
(Not defrosted for 10 minutes)
Compressor OFF
Outdoor fan motor OFF
30 sec later 4 - way valve OFF
36 sec later compressor ON
Heating operation start : Compressor ON
Outdoor heat exchanger temperature:
Over 61
°F(16°C) or
Compressor ON time: Over 15 minutes
05-15
Compressor integrating
operation:
Over 25 minutes to
below 240 minutes
Compressor integrating
operation:
Over 240 minutes
Outdoor heat exchanger
temperature:
Below 21
°F(-6°C)
Outdoor heat exchanger
temperature:
Below 27
°F(-3°C)
Defrost start
Defrost Indicator:
[Operation lamp]
7 sec ON / 2 sec OFF
Defrost end
Summary of Contents for Inverter Halcyon AOU12RL
Page 1: ... Manuel d instruction www lutechenergie com ...
Page 5: ...1 SPECIFICATIONS R410A WALL MOUNTED type INVERTER ...
Page 8: ...2 DIMENSIONS R410A WALL MOUNTED type INVERTER ...
Page 10: ...3 REFRIGERANT SYSTEM DIAGRAM R410A WALL MOUNTED type INVERTER ...
Page 12: ...4 CIRCUIT DIAGRAM R410A WALL MOUNTED type INVERTER ...
Page 14: ...5 DESCRIPTION OF EACH CONTROL OPERATION R410A WALL MOUNTED type INVERTER ...
Page 33: ...6 TROUBLE SHOOTING R410A WALL MOUNTED type INVERTER ...
Page 74: ...8 REPLACEMENT PARTS R410A WALL MOUNTED type INVERTER ...
Page 82: ...1116 Suenaga Takatsu ku Kawasaki 213 8502 Japan Mar 2009 Printed in Japan ...