SERVICE PARTS INFORMATION 2
Check Point 1 : Check Connection
Check Point 2 : Check Winding Resistance
Check Point 3 : Replace Main PCB
R(R)
S(S)
C (T)
Inverter Compressor
Check terminal connection of Compressor
(loose or incorrect wiring)
Check winding resistance of each terminal
If the resistance value is 0 or infinite, replace Compressor.
If the symptom does not change with above Check 1, 2, replace Main PCB.
02-31
R(R)
(RED)
S(S)
(WHITE)
C(T)
(BLACK)
Main PCB
Resistance Value : 0.73 at 20°C
AMP Air Conditioning
www.ampair.co.uk | [email protected]