3 Rack Configuration and Installation
91
E
6
Attach the mounting fixtures and fully tighten the bolts securing the Quake
Proof Stabilizer kit components.
Secure the upper mounting fixture with four M12 bolts.
Note: Be careful when working at height on the top cover. Never put your foot on the rack
because it is very dangerous.
Attach the two lower mounting fixtures, one on the lower front and one on the lower rear of
the rack, each with two M8 bolts.
Use the M8 bolts used for the Quake Proof Stabilizer kit. If you are not using the Quake
Proof Stabilizer kit, use the bolts that come with the connection kit.
Note: When the Quake Proof Stabilizer kit components are attached, some of the M8 bolts of
the Quake Proof Stabilizer kit will not be required and, therefore, some of the bolts that
come with the connection kit will remain unused.
Fully tighten the bolts that were temporarily tightened.
’
Upper mounting fixture
M12 bolt
M8 bolt
Lower mounting fixtur
Summary of Contents for 1740
Page 1: ...J E ...
Page 15: ...3 ラックの構成と設置 15 J 3 3 リヤドアの開き方 1 扉用キーを回し ラックハンドルを持ち上げ 手前に引きます ...
Page 28: ...28 1 マイナスドライバの先端をケージナットの爪とラック柱の間に挿入して ケージナットの爪に押し込みます 2 マイナスドライバを押し下げて取り外します ...
Page 36: ...36 8 富士通ロゴを取り付けます 富士通ロゴを扉の裏から M4 ネジで固定します 標準的な取り付け位置は 横方向寸法が 103 縦方向寸法が 122 です ࡀࠫ ን ㅢࡠࠧ ...
Page 54: ...54 5 必要に応じてラックの柱に固定している M6 ネジを緩め 再調整をしてく ださい ...
Page 63: ...4 ラック設置後の取り扱いについて 63 J 7 必要に応じてラックの柱に固定している M6 ネジを緩め 再調整をしてく ださい ...
Page 67: ...4 ラック設置後の取り扱いについて 67 J 図は 1U 2U 3U 用をまとめて表示していますが 実際の取り付けは空きスペー スに応じて 適切なサイズを選択し 取り付けてください ...
Page 68: ...68 ...