![Fuji Electric SPF Series User Manual Download Page 146](http://html1.mh-extra.com/html/fuji-electric/spf-series/spf-series_user-manual_2341814146.webp)
3-9
Section 3 System Definition
<Procedure for assigning to other tasks>
Select another task for “Level”. “Level” indicates the priority level of the task.
Select a unit, and then click the [>>] button for “Input select” or “Output select.” The unit is allocated.
The output can be assigned to tasks in units of bit. Select the target unit from the “Output select” box and then click the [Detail]
button. The following dialog box appears.
Click the buttons for the target bits to assign. Set ON the bits to assign and OFF the bits not to assign. (All bits are set ON by
default.)
ON state