Manual_FCS-C1000_V1.1_EN
16
5F
5H
STEP 6:
Use the M4 (7mm) sleeve to unscrew the nut and then connect the grounding cable (6A-6C). Use
another sleeve to fix the nut in the opposite, and then at the same time tight the grounding cable nut.
Note: After the fuel cell stack is finished using, disconnect the grounding cable.
Connect the stack to the purge valve through the filter for a longer running time and a better
performance (6D-6F). If not, the gas out of stack may have a negative effect on the purge valve
after a long time running. Connect the output of the purge valve to a place away from the stack in
case of the damage caused by the hydrogen leakage.
6A
6B
6C
6D
Summary of Contents for H-1000
Page 4: ...Manual_FCS C1000_V1 1_EN 1 1 Safety ...
Page 5: ...Manual_FCS C1000_V1 1_EN 2 ...
Page 6: ...Manual_FCS C1000_V1 1_EN 3 ...
Page 7: ...Manual_FCS C1000_V1 1_EN 4 ...
Page 12: ...Manual_FCS C1000_V1 1_EN 9 ...
Page 13: ...Manual_FCS C1000_V1 1_EN 10 ...
Page 14: ...Manual_FCS C1000_V1 1_EN 11 4 Technical Specification ...
Page 24: ...Manual_FCS C1000_V1 1_EN 21 7 System setup diagram SCU Short Circuit Unit GND Grounding ...
Page 26: ...Manual_FCS C1000_V1 1_EN 23 ...
Page 27: ...Manual_FCS C1000_V1 1_EN 24 ...
Page 31: ...Manual_FCS C1000_V1 1_EN 28 ...
Page 34: ...Manual_FCS C1000_V1 1_EN 31 12 Fuel Cell Drawing ...