v
FGP55 Rethermalizer Sequence of Operation
1. Ensure the unit is properly installed. Check the
following:
a. Rethermalizer is level under the vent
hood.
b. Gas supply is connected properly with the
proper gas type (natural or propane) with
the correct size lines. Have the installer
check for proper gas pressure and for gas
leaks.
c. Water connected properly to the coupling
at the rear of the unit.
d. Ensure drain plumbing is routed to the
disposal area.
e. Perform boil-out before first use and
periodically thereafter.
Refer to Chapter 2,
Installation, page 2-1 —
2.8.
2. Ensure the product basket is properly placed in the heating vessel.
3. Perform Lighting Instructions.
Refer to Lighting
Instructions, pages 3-1 — 3-2.
4. Ensure drain valve is closed. Turn the computer
on by pressing the
switch. Note: A decimal
between digits 1 and 2 in either LED display
indicates that the burners are lit.
Refer to Chapter 3,
Operating Instructions,
page 3-4 — 3.9 for specific
product settings and
desired temperatures.
5. Monitor operation of unit as the water reaches
temperature. The computer will display
as water temperature nears programmed setpoint.
6. When the water reaches the desired temperature, place product in the slotted
product basket.
7. Remove product from the basket after the specified time.