All-pin split separation cabling variant (Italy)
Functions
-
Measuring and transferring the required parameters for energy management
and Solar.web by the Fronius Smart Meter.
-
Monitoring of the voltage and frequency grid parameters by the inverter.
-
Disconnecting from the public grid to enable operation in backup power
mode if the grid parameters are outside the country-specific standards.
-
Reconnecting to the public grid when the grid parameters are within the lim-
its specified by the country-specific standards.
-
Establishing a correct ground connection for backup power mode.
-
Option of having a separate backup power circuit or several backup power
circuits that are supplied even during failure of the public grid. The total load
of the backup power circuits must not exceed the nominal output of the in-
verter. Furthermore, the performance of the connected battery must also be
considered.
Transitioning
from feeding en-
ergy into the grid
to backup power
mode
1
.
The public grid is monitored by the inverter's internal grid and system pro-
tection unit and by an external grid and system protection unit.
2
.
Failure of the public grid
3
.
The inverter carries out the measures necessary according to the country
standard and then switches off.
4
.
The external grid and system protection unit opens contactors K1 and K2 for
grid monitoring. This disconnects the backup power circuits and the inverter
from the rest of the home network and from the public grid, as the main con-
tacts of the contactors K1 and K2 open at all pins. To ensure that the public
grid has definitely been disconnected, the NC auxiliary contacts of contactor
K1 give feedback to the external grid and system protection unit.
5
.
The NC main contact of contactors K4 and K5 is closed, establishing a con-
nection between the neutral conductor and the ground conductor. The two
other NC main contacts of contactors K4 and K5 give feedback to the invert-
er that the ground connection has been established correctly.
6
.
The inverter activates relay K3, which activates the remote input of the ex-
ternal grid and system protection unit via an NC contact. This prevents a
connection to the public grid when voltage is restored in the grid.
7
.
The NO contact of relay K3 gives additional feedback to the inverter on
whether the locking was successfully performed by relay K3.
8
.
The inverter decides based on the contactors' feedback as well as the meas-
urement on the inverter terminals and the Smart Meter that backup power
mode can be started.
9
.
The inverter starts backup power mode after a defined checking period.
10
.
All loads in the backup power circuits are supplied with power. The remaining
loads are not supplied with power and are safely isolated.
46
Summary of Contents for Primo GEN24 3.0
Page 2: ......
Page 12: ...12...
Page 13: ...General information 13...
Page 14: ...14...
Page 34: ...34...
Page 35: ...Backup power variant PV Point OP 35...
Page 36: ...36...
Page 38: ...38...
Page 39: ...Backup power variant Full Backup 39...
Page 40: ...40...
Page 48: ...48...
Page 49: ...Installation 49...
Page 50: ...50...
Page 57: ...Do not install the inverter on the ceiling 57 EN...
Page 101: ...Settings user interface of the in verter 101...
Page 102: ...102...
Page 132: ...132...
Page 133: ...Options 133...
Page 134: ...134...
Page 144: ...144...
Page 145: ...Appendix 145...
Page 146: ...146...
Page 172: ...172...
Page 173: ...Circuit diagrams 173...
Page 174: ...174...
Page 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Page 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Page 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Page 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Page 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Page 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Page 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Page 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Page 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Page 187: ...Dimensions of the inverter 187...
Page 188: ...188...
Page 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Page 190: ...190...
Page 191: ...191 EN...
Page 192: ......