Connecting solar module strings to the inverter
General com-
ments regarding
solar modules
To enable suitable solar modules to be chosen and to use the inverter as effi-
ciently as possible, it is important to bear the following points in mind:
-
If insolation is constant and the temperature is falling, the open circuit
voltage of the solar modules will increase. The open circuit voltage must not
exceed the maximum permissible system voltage. If the open circuit voltage
exceeds the specified values, the inverter will be destroyed and all warranty
claims will be forfeited.
-
The temperature coefficients on the data sheet of the solar modules must be
observed.
-
Exact values for sizing the solar modules can be obtained using suitable cal-
culation tools, such as the
IMPORTANT!
Before connecting up the solar modules, check that the voltage for the solar
modules specified by the manufacturer corresponds to the actual measured
voltage.
IMPORTANT!
The solar modules connected to the in-
verter must comply with the IEC
61730 Class A standard.
IMPORTANT!
Solar module strings must not be
earthed.
Safety
WARNING!
Incorrect operation or poorly executed work can cause serious injury or dam-
age.
Commissioning as well as maintenance and service work in the power module of
the inverter must only be carried out by service personnel trained by Fronius and
only within the scope of the respective technical regulations. Read the Installa-
tion and Operating Instructions before installing and commissioning the equip-
ment.
68
Summary of Contents for Primo GEN24 3.0
Page 2: ......
Page 12: ...12...
Page 13: ...General information 13...
Page 14: ...14...
Page 34: ...34...
Page 35: ...Backup power variant PV Point OP 35...
Page 36: ...36...
Page 38: ...38...
Page 39: ...Backup power variant Full Backup 39...
Page 40: ...40...
Page 48: ...48...
Page 49: ...Installation 49...
Page 50: ...50...
Page 57: ...Do not install the inverter on the ceiling 57 EN...
Page 101: ...Settings user interface of the in verter 101...
Page 102: ...102...
Page 132: ...132...
Page 133: ...Options 133...
Page 134: ...134...
Page 144: ...144...
Page 145: ...Appendix 145...
Page 146: ...146...
Page 172: ...172...
Page 173: ...Circuit diagrams 173...
Page 174: ...174...
Page 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Page 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Page 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Page 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Page 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Page 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Page 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Page 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Page 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Page 187: ...Dimensions of the inverter 187...
Page 188: ...188...
Page 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Page 190: ...190...
Page 191: ...191 EN...
Page 192: ......