Suitable Grids
Delta
Setup:
208
240
220
BR
50 Hz
MG 3P
MG 1P
No neutral conductor
Nominal voltage:
208 V
240 V
220 V
220 V
50 Hz 208–240 V
Microgrid 208 V
Microgrid 240 V
Appropriate inverter:
Symo Advanced
10.0-3 208–240 / 12.0-3
208–240
=
~
L1
L2
L3
L2-L3
120°
WYE
Setup:
208 N
220 N
BR N
50 HN
HI2
480 N
440 N
50 HN
MG 3N
MG 2N
MG 5N
MG 6
CAL3
HI3
Neutral conductor required
Nominal voltage:
208 V
220 V
220 V
50 Hz 208–240 V
208 V
480 V
440 V
50 Hz 415 V
Microgrid 208 V
Microgrid 50 Hz 208–240 V
Microgrid 50 Hz 480 V
Microgrid 480 V
480 V
480 V
Appropriate inverter:
Symo Advanced
10.0-3 208–240 / 12.0-3
208–240
Symo Advanced
15.0-3 480 / 20.0-3 480 /
22.7-3 480 / 24.0-3 480
=
~
L1
L2
L3
N
L2-L3
120°
Hi-Leg
Delta
Setup:
240 N
50 HN
MG 1N
MG 2N
HI1
Neutral conductor required
Nominal voltage:
240 V
50 Hz 208–240 V
Microgrid 240 V
Microgrid 50 Hz 208–240 V
208 V
Appropriate inverter:
Symo Advanced
10.0-3 208–240 / 12.0-3
208–240
=
~
L3
L1
L2
N
L1-N
L2-N
L
2
-L
3
L
3
-L
1
9
0
°
9
0
°
180°
23
EN-US
Summary of Contents for 10.0-3 208-240
Page 2: ......
Page 13: ...Preparation 13...
Page 14: ...14...
Page 20: ...1 2 20...
Page 21: ...AC 21...
Page 22: ...22...
Page 31: ...DC 31...
Page 32: ...32...
Page 41: ...Laying Solar Net Cables 41...
Page 42: ...42...
Page 43: ...Data communication Lay data commu nication cables 1 2 3 4 5 22 lbf in 2 5 Nm 6 43 EN US...
Page 45: ...1 2 1 3 TX20 10 6 lbf in 1 2 Nm 1 2 4 5 45 EN US...
Page 46: ...46...
Page 47: ...Finally 47...
Page 48: ...48...
Page 51: ...4 3 in 1 ON OFF Lock 22 1 lbf in 2 5 Nm 2 3 4 51 EN US...
Page 52: ...22 1 lbf in 2 5 Nm 5 6 AC ON 2 ON OFF Lock 1 7 52...
Page 55: ...Options 55...
Page 56: ...56...
Page 62: ...62...
Page 63: ...Care and maintenance 63...
Page 64: ...64...
Page 66: ...66...
Page 67: ...67 EN US...