Using for the first time
Using the Inverter
for the First Time
WARNING!
Danger from incorrect operation and work that is not carried out properly.
This can result in severe personal injury and damage to property.
▶
Only qualified staff are authorized to commission the inverter and only within the
scope of the respective technical regulations.
▶
Read the Installation Instructions and Operating Instructions before installation and
commissioning.
When starting up the inverter for the first time, various setup settings must be selected.
If setup is stopped before it is completed, it can be started again via an AC reset. An AC
reset can be carried out by switching the automatic circuit breaker off and on again.
The country setup can only be set when starting the inverter for the first time. If the coun-
try setup needs to be changed at a later date, contact your technical support.
1
2
1
Select Country
1
2
50 Hz
International 50 Hz
2
* Country setup examples
The available country setups may change during a software update. Therefore, the following list may not
exactly match the display on the inverter.
Setups
:
Symo Advanced 208–240
240 N (with NL-Mon)
240 (without NL-Mon)
208 N (with NL-Mon)
208 (without NL-Mon)
220 N (with NL-Mon)
220 (without NL-Mon)
50 Hz
50 HN (with NL-Mon)
BR N (Brazil 220 V with NL-Mon)
BR (Brazil 220 V without NL-Mon)
HI1 (Hawaii 240 V with NL-Mon)
HI2 (Hawaii 208 V with NL-Mon)
Symo Advanced 208–240
MG1N* (Microgrid 240 V with NL-
Mon)
MG1P* (Microgrid 240 V without
NL-Mon)
MG2N* (Microgrid 220 V without
NL-Mon)
MG3N* (Microgrid 208 V without
NL-Mon)
MG3P* (Microgrid 208 V without
NL-Mon)
Symo Advanced 480
480 N (with NL-Mon)
440 N (with NL-Mon)
50 HN (with NL-Mon)
CAL3 (California 480 V with NL-
Mon)
HI3 (Hawaii with NL-Mon)
MG5N* (Microgrid 240 V with NL-
Mon)
MG6* (Microgrid)
* For more information about
"Field Adjustable Trip Points"
and
"Special Purpose Utility-Interactive"
see
www.fronius.com/QR-link/42042102339
53
EN-US
Summary of Contents for 10.0-3 208-240
Page 2: ......
Page 13: ...Preparation 13...
Page 14: ...14...
Page 20: ...1 2 20...
Page 21: ...AC 21...
Page 22: ...22...
Page 31: ...DC 31...
Page 32: ...32...
Page 41: ...Laying Solar Net Cables 41...
Page 42: ...42...
Page 43: ...Data communication Lay data commu nication cables 1 2 3 4 5 22 lbf in 2 5 Nm 6 43 EN US...
Page 45: ...1 2 1 3 TX20 10 6 lbf in 1 2 Nm 1 2 4 5 45 EN US...
Page 46: ...46...
Page 47: ...Finally 47...
Page 48: ...48...
Page 51: ...4 3 in 1 ON OFF Lock 22 1 lbf in 2 5 Nm 2 3 4 51 EN US...
Page 52: ...22 1 lbf in 2 5 Nm 5 6 AC ON 2 ON OFF Lock 1 7 52...
Page 55: ...Options 55...
Page 56: ...56...
Page 62: ...62...
Page 63: ...Care and maintenance 63...
Page 64: ...64...
Page 66: ...66...
Page 67: ...67 EN US...