Contents
Page 4
M1010108_en
s
C
1
General Information
6
1.1
Notes on Standards
6
1.2
Design Information
7
1.2.1
Approval and obligation to report ...................................................................... 7
1.2.2
Requirements for central heating water ............................................................. 7
1.2.3
Ventilation of boiler room ................................................................................ 7
1.2.4
Installing the heating system / Standards .......................................................... 8
Combination with storage tank ......................................................................... 8
Return feed lift............................................................................................... 8
1.2.5
Chimney connection/chimney system ................................................................ 9
Draught limiter............................................................................................... 9
Boiler data for constructing the flue gas system:................................................. 9
2
Technology
10
2.1
Turbomatic TMC 28-55 dimensions
10
2.2
Components and Connections
11
2.3
Technical specifications
12
Test data for operation with wood chips ........................................................... 12
Test data for operation with pellets ................................................................. 13
3
Installation
14
3.1
Transport
14
3.1.1
Positioning................................................................................................... 14
3.1.2
Temporary storage ....................................................................................... 14
3.2
Setting up in the boiler room
14
3.2.1
Removing the boiler from the pallet ................................................................ 14
3.2.2
Moving the boiler in the boiler room ................................................................ 14
3.2.3
Minimum distances in the boiler room.............................................................. 15
3.2.4
General information for boiler room................................................................. 15
3.3
Assembly work
16
3.3.1
Installing the chamber in the boiler ................................................................. 16
3.3.2
Installing the stoker...................................................................................... 19
Installing the burn back flap drive (only with burn back flap) .............................. 20
3.3.3
Installing the induced draught fan................................................................... 21
3.3.4
Installing the WOS Drive ............................................................................... 22
3.3.5
Fitting the automatic heat exchanger ash removal (optional) .............................. 23
Conversion for ashcan on right ....................................................................... 23
Assembly work on boiler................................................................................ 24
3.3.6
Installing the combustion chamber overpressure sensor..................................... 26
3.3.7
Fitting switch cabinet and cable ducts.............................................................. 26
3.4
Electrical connection
28
3.4.1
Laying the cable ........................................................................................... 28
3.5
Connecting the thermal discharge safety device
29
3.5.1
Thermal discharge safety device sensor ........................................................... 29