![Froling Turbomatic TMC 28-55 Installation Instructions Manual Download Page 25](http://html1.mh-extra.com/html/froling/turbomatic-tmc-28-55/turbomatic-tmc-28-55_installation-instructions-manual_2338741025.webp)
Installation
Assembly work
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen
Page 25
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 [email protected] www.froeling.com
M1010108_en
3
U
Fit the previously removed key-way
safety device to the shaft stub
U
Tighten the screws on the flange and
ensure that the worm is correctly
aligned
U
Insert the ash baffle into the boiler
2x guide plates with
Turbomatic 48/55
U
Position the ash baffle inside the
boiler on the front inner wall upright
(see drawing below)
With Turbomatic 48/55: guide
plates on both inner walls
TMC 28/35
TMC 48/55
U
Slide in entire unit and secure with
screws provided
U
Fit ash removal flange to opposite
side using screws provided