Boiler Installation
Boiler assembly
Page 34
M1060008_US
v
3
Place the upper cleaning port cover
in position and lock the linkage into
place by turning it clockwise to
tighten
Installing the control unit
Position the control box on the boiler
Remove the cover from the control unit
Attach the control unit to the boiler using four self-tapping screws
Installing the flue gas sensor
Screw-in the brass bushing for the flue gas sensor
Push in the flue gas sensor until about 20 mm of the sensor
remains protruding from the bushing and attach lightly using the
fixing screw
Slide rubber insulation toward the control end of the wire.
1
20mm