Boiler Installation
Boiler Assembly
Froling GmbH, Industriestrasse 12, A-4710 Grieskirchen, Austria
Page 29
www.froling.com
M1060008_US
3
Installing the insulating back panel
Attach the insulating wool pad to
the back of the boiler
Thread the cables for the induced
draught fan through the insulation
Mount the insulating back panel
and fasten it at the lower edge
Thread the cables for the actuators
through the pre-stamped opening
Attach the insulating back panel to
the complete assembly
Tighten the screws on the blank
cover and cleaning cover
Installing the Actuators
Using pliers, turn the pneumatic
rods anti-clockwise until the left-
hand limit stop is reached
Press the safety-release button
(1) and turn the actuator anti-
clockwise to the “0” position
Turn the selector switch (2) to
position “L” using a screw-driver
Fit the torque support to the
actuator
1
2