4 | Operating the system
26
B1650222_en | Operating instructions PE1e Pellet
4.3.2 Select information displays
Tapping on the randomly selectable information displays in the basic display opens the
respective menu. The following options are available depending on the system
configuration:
Menu
Selection
Icon
Description
Boiler
Empty ash box in
Display of the remaining heating hours until the
message “Ash box full, please empty” appears.
Temperatures
Display of boiler und flue gas temperature
Calorific value heat
exchanger
1)
Display of boiler and flue gas temperature
before or after the calorific value heat
exchanger.
Operation hours
Display of the operating hours and the operating
hours since last maintenance.
Outside air
temperature
Temperatures
Display of the current outside air temperature.
Boiler 2
Temperatures
Display of the temperature of the secondary
boiler and the status of the burner relay
Solar
Temperatures
Display of the collector temperature and control
of the collector pump.
Pellets
Remaining pellet
amount in storeroom
Display of the remaining amount of pellets in
storeroom.
Heating
circuit 01 –
18
Temperatures
Display of the actual flow temperature and flow
temperature setpoint of the respective heating
circuit.
DHW tank
01 – 08
Temperatures
Display of the current DHW tank temperature
and control of DHW tank pump of the respective
DHW tank.
Storage
tank 01 – 04
Temperatures
Display of storage tank temperature, top and
bottom
3 temperature
sensors
1)
Display of storage tank temperature, top, middle
and bottom.
4 temperature
sensors
1)
Display of storage tank temperature top, store
sensor 2, store sensor 3 and bottom.
Circulation
pump
Temperatures
Display of the status at the flow sensor (if
present) and the current circulation return
temperature.
Differential
controller
Temperatures
Display of the current temperature from source
and recess of the differential regulator