3.
Then, insert the mains plug of the dust exhaust system in the con-
trol box and insert the mains plug of the control box in the socket.
4.
Switch on the dust exhaust system (ON).
5.
Re-connect the jaw crusher to the power supply and turn the main
switch (9) to 1 (on).
6.
The dust exhaust system can be switched on and off at the control
panel (C) when the Jaw Crusher is ready for operation.
7.2 Conversion kit for metal-free pre-crushing
Tab. 1: Conversion kit for iron-free pre-crushing, 01.2090.00, consisting
of:
Quan-
tity
Article number Article designation
Material
1
01.3501.00
Coated source mate-
rial container
Proco-PA 11 (Rilsan)
1
01.2101.00
Coated funnel, com-
plete
Proco-PA 11 (Rilsan)
1
43.4045.16
One pair of support
walls
POM
2
01.2531.16
Block for grinding
chamber opening
POM
2
01.7420.13
Clamping strip for
crushing jaw
Duralu
Accessories
- 39 -