5.6.2 POURING OUT THE MIXTURE INTO A DIFFERENT CONTAINER
Please follow this procedure to pour the product from
the boiling tank to an external container:
- Verify that the cock body is set diagonally so the
product can fall directly into the desired container.
- If not, extract the locking pin from its seat, rotate
the cock body diagonally and reposition the pin.
- Whatever function the machine is running, press
“
MIXING
” on the boiler pushbutton panel.
- To start pouring out the mixture, rotate the piston
knob until it is unlocked and pull it slowly towards
yourself.
With very liquid products, it is important to pull the
piston slowly and very carefully to reduce the
speed of the outlet flow.
Incorrect movements could seriously injure and
burn the operator!
- When the entire product is poured out and the
boiling tank is empty, push the piston to its
closing position and rotate it to its locking
position.
- Press the “
STOP
” key on the boiler pushbutton
panel.
Summary of Contents for Twin lcd 35
Page 17: ...ENGLISH 12 5 4 BATCH FREEZER CONTROL PANEL TWIN 35 60 ...
Page 65: ...ENGLISH 60 ...
Page 66: ......
Page 71: ...APPENDICI 6 TWIN lcd 35 45 60 Tav 1 12 ...
Page 73: ...APPENDICI 8 TWIN lcd 35 45 60 Tav 2 12 ...
Page 75: ...APPENDICI 10 TWIN lcd 35 45 60 Tav 3 12 ...
Page 77: ...APPENDICI 12 TWIN lcd 35 45 60 Tav 4 12 ...
Page 79: ...APPENDICI 14 TWIN lcd 35 45 60 Tav 5 12 ...
Page 81: ...APPENDICI 16 TWIN lcd 35 45 60 Tav 6 12 ...
Page 83: ...APPENDICI 18 TWIN lcd 35 45 60 Tav 7 12 ...
Page 85: ...APPENDICI 20 TWIN lcd 60 Tav 8 12 ...
Page 87: ...APPENDICI 22 TWIN lcd 35 45 Tav 9 12 ...
Page 89: ...APPENDICI 24 TWIN lcd 35 45 60 Tav 10 12 ...
Page 91: ...APPENDICI 26 TWIN lcd 35 45 60 Tav 11 12 ...
Page 93: ...APPENDICI 28 TWIN lcd 35 45 60 Tav 12 12 ...