background image

8

STEP 1

Remove the junction box, cover and screw (above items) from the shipping position underneath the fan motor. Install one
junction box mounting leg in the upper left position facing the rear of the junction box.

STEP 2

Remove and discard the plastic bushing from the conduit connector on the side panel of the control compartment. Strip the
black wires only, approximately 1/2 inch (13 mm).

STEP 3

Insert all wires (2 black, 1 green) into the box and thread the box onto the conduit connector until tight. Back off counter
clockwise until the junction box is vertical with the mounting leg at the upper–right position facing the box opening. Be
sure that the shell can fit between this box and the chassis.

Unpacking The Unit

STEP 1

Remove decorative plastic return air grille to a safe area away from the unit.

STEP 2

Remove the installation hardware, wingboard and two (one light colored and one dark colored) gaskets from beneath the
unit, and place them in a safe area away from the unit.

STEP 3

Remove the chassis retainer by removing the far right screw in the basepan (see Figure A); save this screw to reattach the
chassis retainer after installation (Step 15). Also, remove and discard the two retainer screws and plastic bushings located
at the rear of the unit.

STEP 4

While an assistant holds the cabinet stationary, use the hand pull at the front of the base pan (see Figure A) to pull the
chassis out of the cabinet. Remove white foam blocks used to restrain the compressor during shipment.  Inspect basepan
for dislodged white blocks, and remove. Do not remove any other foam.

Chassis Wiring and Preparation

CABINET

HAND PULL

CHASSIS RETAINER

FAR RIGHT SCREW

HAND PULL

Figure A

CABINET

STEP 3

PROVIDED HARDWARE

1 JUNCTION BOX

FRIEDRICH PN: 613-893-00

2 MOUNTING LEGS

RACO INC. PN: 5324-0

2 LEG SCREWS
2 HOLE COVERS
1 GROUND SCREW
BOX COVER

FRIEDRICH PN:  613-892-00

GASKET

RACO INC. PN: 5173-0

2 SCREWS
1 SHEET METAL SCREW

Summary of Contents for SH15

Page 1: ...Installation Operation Manual Hazardous Duty Room Air Conditioner 230 Volt SH15 SH20 www segind com br...

Page 2: ...s manual and on your appliance Always read and obey all safety messages This is a safety Alert symbol This symbol alerts you to potential hazards that can kill or hurt you and others All safety messag...

Page 3: ...well 4 When you rst turn on your Friedrich set the thermostat to its coldest position to cool the room When the desired temperature is reached turn the thermostat control to ward the warmer position u...

Page 4: ...outdoor temperatures as low as 45 F 7 C Freezing should only occur whentheoutsideairisdampandbelow45 F 7 C Iftheindoor Maintenance Checklist coilshouldiceoverwhilecooling setthethermostattothewarm est...

Page 5: ...enum chamber for quieter more ef cient cooling Entire unit test run in environmental chamber before crating Eight way air ow control for uniform air circulation Patented electronic control circuit Con...

Page 6: ...hassis Only alternating current A C no direct current D C can be used An overloaded circuit will invariably cause malfunction or failure of the air conditioner therefore it is extremely important that...

Page 7: ...1 HEX HEAD 4 4 T U N D L E W T A L F 4 2 0 1 3 4 SCREW SHEET METAL 12A x 2 7 WINGBOARD ANGLE MOUNTING 5 WINGBOARD ANGLE TOP 1 6 WINGBOARD ANGLE SIDE 2 7 SCREW SHEET METAL 8A x 3 8 2 WINGBOARD MOUNTIN...

Page 8: ...d and two one light colored and one dark colored gaskets from beneath the unit and place them in a safe area away from the unit STEP 3 Remove the chassis retainer by removing the far right screw in th...

Page 9: ...B TAB Detail B 1 Detail B 2 LOOP Position the sill plate into the cabinet with the sill plate holes to the back Align the plate 2 inches from the front of the cabinet and secure it with a nut and bolt...

Page 10: ...inet Carefullyslidethecabinet through the open window until the sill plate channel rests behind the window sill and the top support angle rests against the window See Figure D Center the cabinet side...

Page 11: ...Installation Sill Plate 10 24 SCREW 10 24 FLAT NUT 3 8 10 MM SLOPE DOWN 12A X 2 SHEET METAL SCREW 1 X 2 OR 2 X 4 SPACER BETWEEN WALL AND BRACKET SHOULD BE USED ON ALU MINUM ASBESTOS OR VINYL SIDING F...

Page 12: ...ng steel clips Item 10 to the edges of the cut wingboard panels See Figure G NOTE FOR REASONS OF SECURITY AND SAFETY THE CUSTOMER MUST PROVIDE A MEANS OF PREVENTING THE WINDOW FROM OPENING STEP 8 When...

Page 13: ...ow the suggested typical installations in Figure L M or N on Page 15 NOTE IF THE WALL CONSTRUCTION IS TYPICAL FRAME OR 2 X 4 STUDDING WITH BRICK OR STONE VENEERS LOCATE THE HOLE NEXT TO ONE OF THE STU...

Page 14: ...WEATHER CABINET CAULK ALL SIDES SHIM THE VOID SPACE AT THE TOP AND SIDES WITH WOOD AS REQUIRED CAULK ALL SIDES WEATHER CABINET SHIM VOID SPACES AT TOP AND SIDES WITH WOOD AS REQUIRED FRAME WALL CONST...

Page 15: ...es in each side at the locations shown Figure O and install four 4 12 x 2 screws Item 4 If the hole construction in Step 2 provides a sturdy mount with solid vertical studs no support brackets are req...

Page 16: ...wiring must be provided to this junction box in accordance with NATIONAL ELECTRIC CODE ARTICLE 501 Field and equipment grounds are to be terminated at the post in the junction box with the green scre...

Page 17: ...e grille up and onto the unit s latches at the bottom STEP 3 You have completed your installation Conduct a review of your installation to insure that the unit is safely and securely installed Refer t...

Page 18: ...nental United States The Friedrich warranty does not cover 1 Any charges for removal transportation or reinstallation of the unit 2 the cost of labor to replace parts other than those described above...

Reviews: