
140.960-IOM (JUN 2016)
Page 32
IDCF & IDC3 EVAPORATIVE CONDENSERS
INSTALLATION
Share two lower
fasteners on
upper ladder
bracket
Upper ladder
bracket
Hoop
Detail D
Detail A
Detail B
Detail C
LADDER SAFETY CAGE
1. If the safety cage is shipped in multiple pieces, reassemble
the safety cage.
2. Bolt the safety cage to the ladder using flatwashers and
locknuts. Orient all fasteners with bolt heads inside safety
cage. See Figure below and refer to Table 4 for the quan-
tity of bolting locations for different safety cage heights.
Figure 48 - Safety Cage
NOTICE
Safety gates are provided for all guardrail openings,
and all components are designed to meet OSHA
requirements.
TABLE 4. LADDER SAFETY CAGE BOLTING LOCATION AND QUANTITIES
CAGE HEIGHT
(FT)
BOLTING LOCATION
CAGE HEIGHT
(FT)
BOLTING LOCATION
CAGE HEIGHT
(FT)
BOLTING LOCATION
A
B
C
D
A
B
C
D
A
B
C
D
4
1
–
–
1
12
1
1
2
1
20
1
1
4
1
5
1
1
–
1
13
1
1
2
1
21
1
1
4
1
6
1
1
–
1
14
1
1
2
1
22
1
1
4
1
7
1
1
–
1
15
1
1
2
1
23
1
1
4
1
8
1
1
–
1
16
1
1
2
1
24
1
1
4
1
9
1
1
1
1
17
1
1
3
1
25
1
1
5
1
10
1
1
1
1
18
1
1
3
1
27
1
1
5
1
11
1
1
1
1
19
1
1
3
1