IDCF & IDC3 EVAPORATIVE CONDENSERS
INSTALLATION
TOP PERIMETER GUARDRAILS
REFER TO INDIVIDUAL FIGURES FOR PARTICULAR UNITS.
1. Secure the individual rail segments to the factory installed
post brackets using the 3/8” x 4” bolts provided. See the
following Figures and the accompanying rail length tables
to determine the correct location for each rail segment. See
Figure 32 for the post attachment detail.
Figure 32 – Top Perimeter Guardrail Post Attachment
3/8” Lockwasher
3/8” Nut
3/8” Flatwasher
3/8” x 4” Bolt
2. Secure adjacent rail segments to each other using the 5/16”
x 3 3/4” bolts provided. See Figure 33.
Figure 33 – Top Perimeter Guardrail Segment Attachment
5/16”
Lockwasher
5/16” Nut
5/16”
Flatwasher
5/16”
Flatwasher
5/16” x 3 3/4”
Bolt
3. For multi-cell units, install the gap plates. Secure plates on
one side by re-using the 5/16” self-tapping screws from the
fan deck. Secure on the other side using the 1/4” self- drilling
screws provided. See Figure 34.
4. Install the toe boards using the 5/16” self-tapping screws
provided. See Figure 35.
5. Install the safety gate(s) using the 5/16” x 5” bolts provided.
See Figure 36.
Figure 35 – Top Perimeter Guardrail Toe Board Attachment
Figure 34 – Top Perimeter Guardrail Gap Plate Attachment
Figure 36 – Top Perimeter Guardrail Safety Gate Attachment
5/16” x 5”
Bolt
5/16”
Lockwasher
5/16”
Nut
5/16” Flatwasher
NOTICE
For clarity the basin and coil casing sections
are not shown.