
140.960-IOM (JUN 2016)
Page 17
IDCF & IDC3 EVAPORATIVE CONDENSERS
INSTALLATION
FILL ACCESS PLATFORM - IDCF ONLY
REFER TO FIGURES BELOW FOR YOUR PARTICULAR UNIT.
1. For 18’ long platforms, first secure the bolt plates PHN to the factory installed brackets on the casing frame using the 5/16”
self-tapping screws provided. See Figures 27 and 28, Detail F.
Detail C
Figure 25 – Fill Access Platform with Side Ladder – IDCF-0709, 1012, 2012, 1212, 2412
Detail B
Toe board
PHA
Detail A
Platform frame
Detail D
PHK
(PHL other end)
PHA