
610.020-IOM (NOV 19)
Page 16
EVAPORATOR AND AIR COOLER
INSTALLATION - OPERATION - MAINTENANCE
GBF/AGBF/GGBF
Step 1
Units shipped with heavy duty plastic wrap on the skid.
Step 2
Remove plastic wrap and support members from the unit.
Step 3
Leave the unit positioned on the skid. Place forks under
the full span of the skid.
Step 4
Secure hangers to the ceiling. Remove all shipping legs
and the skid from the unit.