
610.020-IOM (NOV 19)
Page 15
EVAPORATOR AND AIR COOLER
INSTALLATION - OPERATION - MAINTENANCE
MANP
Step 1
Units shipped with heavy duty plastic wrap on the skid.
Step 2
Use a forklift to lift the unit off the truck.
Step 3
a. Remove the plastic wrap and shipping supports.
b. If unit is foot mounted, remove the skid.
Or
If unit is ceiling hung, leave the skid in place and secure
the hangers to support rods.
d. Remove skid.
Step 4
a. Use a spreader bar when lifting the unit with a crane.
b. Use all crane lift points.
c. Ensure load is evenly balanced.
d. Rigging straps must
not exceed a 30°
angle.
e. Secure feet to steel
structure and bolt or
weld in place.
See images for guideance:
MANP, 90°
MANP - 45°
MANP, 0°