
610.020-IOM (NOV 19)
Page 14
EVAPORATOR AND AIR COOLER
INSTALLATION - OPERATION - MAINTENANCE
MDN
Step 1
As shipped, units are stacked, but individually skidded.
Step 2
Remove all crating from the top and sides of the skids.
Leave the units on the skids.
Step 3
Place forks under the full span of the skid.
Step 4
Secure hangers to the ceiling. Remove all shipping legs
and the skid from the unit.