![Fresco Pro FFC1A-03H Manual Download Page 61](http://html1.mh-extra.com/html/fresco/pro-ffc1a-03h/pro-ffc1a-03h_manual_2331609061.webp)
FCAC-KTSM-2008-12
Install the Main Body
The Installation of FFC1A
59
2. Install the Main Body
z
Please refer to the following figure for the hanging screw bolts.
z
Please
install
with
Ø10 hanging screw bolts.
z
The handling to the ceiling varies from the constructions, consult the construction person for the specific
condition.
1. The size of the ceiling to be handled------ Do keep the ceiling flat. Consolidate the roof beam for
possible vibration.
2. Cut off the roof beam.
3. Strengthen the place that has been cut off, and consolidate the roof beam.
4. Connect wires and pipes inside the ceiling after the air conditioner is hanged.
FFC1A-03H FFC1A-04H
z
After
the
selection
of
installation
location, position the water pipes, drain pipes, indoor & outdoor wires to
the connection places before hanging up the machine.
z
The installation of hanging screw bolts.
Summary of Contents for Pro FFC1A-03H
Page 1: ...FCAC KTSM 2008 12 Content Content i...
Page 21: ......
Page 33: ...FCAC KTSM 2008 12 Service Space Compact Four way Cassette Type 31 4 Service Space...
Page 37: ......
Page 46: ...Service Space FCAC KTSM 2008 12 44 One way Cassette Type 4 Service Space FFC1A 03H FFC1A 04H...
Page 48: ...Wiring Diagrams FCAC KTSM 2008 12 46 One way Cassette Type FFC1A 04H FFC1A 04HA...
Page 51: ......
Page 54: ...Explored View FCAC KTSM 2008 12 52 One way Cassette Type 8 Explored View FFC1A 03H FFC1A 04H...
Page 56: ...Explored View FCAC KTSM 2008 12 54 One way Cassette Type FFC1A 03HA FFC1A 04HA...
Page 70: ...Install the Main Body FCAC KTSM 2008 12 68 The Installation of FFC4A FFC4B...
Page 71: ...FCAC KTSM 2008 12 Install the Main Body The Installation of FFC4A FFC4B 69...
Page 73: ...FCAC KTSM 2008 12 Install the Panel The Installation of FFC4A FFC4B 71...