ADDITIONAL ADJUSTMENT
Floating Pulley Adjustment–
Tools required: Adjustable wrench
1. Lift the top weight off the
weight stack and insert the
weight pin into the second
weight and the sixth hole
from the top of the weight
rod.
2. Rotate the cam clockwise
and disengage the cam
cable on the small cam.
3. To remove slack from the
cables, turn the cam cable
clockwise into the “U”-
bracket, where shown.
To add slack to the cables,
turn the cam cable coun-
terclockwise out of the “U”-
bracket.
4. Re-engage the cam cable onto the small cam.
5. Lift the top weight and remove the weight pin.
Lower the top weight onto the second weight.
6. Readjust as necessary.
9
CABLE ADJUSTMENTS
CAUTION:
After making any cable adjustment, pull
the handle using a light load and have someone
make sure that the cable is not derailed from a pulley
or rubbing on a guard (see CABLE GUARDS on page
8).
INITIAL ADJUSTMENT
Top Weight Adjustment—
Tools required: Hammer, 1/8” punch, 3/16” roll pin
Note:
This is the primary adjustment for all
machines.
1. Lift the coupler cover from the top weight cou-
pler.
2. Remove the roll pin from the top weight coupler
with an 1/8” punch and a hammer.
3. Align the hole in the cable coupling with the
appropriate adjustment hole in the top weight
coupler:
• If more slack is needed in the cable, align the
cable coupling with a higher hole.
• If less slack is needed in the cable, align the
cable coupling with a lower hole.
4. With the cable coupling aligned with the new
hole, drive a new roll pin into the top weight cou-
pler and cable coupler.
5. Lower the coupler cover over the top weight cou-
pler.
Adjustment Hole
Cable Coupling
Top Weight
Coupler
Coupler Cover