
5
INTRODUCTION
SAFETY OVERVIEW
The Optimizer3 Circuit Breaker Performance and SF₆ Gas Density Monitor is intended to be used on high voltage energized circuit
breakers or equipment. Personnel using equipment on energized equipment must be authorized by the relevant regulatory bodies
to carry out such work and must have appropriate training.
The information given in this document is given as a guide only. It is the user’s responsibility to ensure that correct and safe
procedures are followed at the actual worksite. Franklin Electric Grid Solutions offers no warranty or indemnity for accidents that
may occur when following these instructions.
HAZZARD ASSESSMENT
Prior to installing the equipment, the operator must carry out a worksite, pre-job hazard assessment to identify the safety and
environmental needs. This must be done prior to commencing work and prior to recommencing work after leaving and returning
to the worksite. As a minimum, this hazard assessment should:
• Identify possible hazards and risks.
• Identify the safety needs of the job.
• Identify the correct procedures, practices and equipment.
• Eliminate unsafe conditions and actions from the worksite.
• Identify the need for personal protective equipment.
• Inspect equipment before use.
Prior to working with and installing Optimizer3, you should check the following:
• The sheaths of all cables are secured and undamaged.
• Plugs and connectors are properly connected and serviceable.
• There should also be an ongoing risk assessment during the job.
WORKING ON ENERGIZED CONDUCTIONS AND EQUIPMENT
For the correct and safe use of this equipment, it is essential that all operating personnel follow appropriate safety procedures.
Check with your employer and relevant regulatory body’s rules for working with energized equipment.