
23
Setting up string parameters
1. Click Parameters, and open Easy Setup.
2. Choose the string number you want to configure.
3. Choose the battery voltage.
4. Choose the number of cells in the string.
5. Set the capacity (Amp hours), and then click Apply.
Changing port settings
1. Click Parameters.
2. In the Parameters section, scroll through the list of editable parameters to locate and edit
the port parameters you want to modify.
Summary of Contents for CELLGUARD
Page 1: ...CELLGUARD wired Battery monitoring system Installation guide ...
Page 12: ...8 Intentionally Blank ...
Page 14: ...10 ...
Page 42: ...Intentionally Blank ...
Page 43: ...Intentionally Blank ...
Page 44: ...167 000800 r1 ...