frako EMG 1500-PN Operating Manual Download Page 2

Safety instructions  

EMG 1500 Operating Manual 

 

Safety instructions

 

 

!!! Important, read before commissioning !!! 

 

• 

The user must ensure that all operators are familiar with 
these

 

operating instructions and follow them at all times. 

• 

The operating instructions must be read carefully before 
the instrument is mounted, installed and commissioned. 

• 

All actions taken must follow the operating manual. 

• 

The installation and commissioning may only be carried 
out by appropriately qualified personnel with due regard 
for all rules and regulations that are in force. 

• 

The instrument contains live components at the AC supply 
voltage and must therefore not be opened. 

• 

If the instrument is visibly damaged, it must not be 
installed, wired up or commissioned. 

• 

If the instrument does not work after commissioning, it 
must again be isolated from the mains. 

• 

Any further laws, standards, guidelines, etc. relevant to this 
product must be complied with. 

 

Summary of Contents for EMG 1500-PN

Page 1: ...Gateway EMG 1500 PN EMG 1500 PN Energy Management System Run Made in Germany Gateway Serial Ethernet Connect Bus error Bus Operating manual EMG 1500 PN...

Page 2: ...ollow the operating manual The installation and commissioning may only be carried out by appropriately qualified personnel with due regard for all rules and regulations that are in force The instrumen...

Page 3: ...Connection to the FRAKO Starkstrombus 7 3 2 4 RS 232 connection 8 4 Commissioning 9 4 1 Preparations before commissioning 9 4 2 Instrument self test 9 4 3 Assigning an IP address 9 4 3 1 Assigning the...

Page 4: ...s used to carry out all network settings i e IP address subnet mask and gateway see Section4 3 page 9 The supply voltage must then be removed from the instrument Installation The instrument is mounted...

Page 5: ...SW is used to configure the EMG 1500 PN The EMIS 1500 central unit uses the EMG 1500 PN to access the individual instruments in the Energy Management System and collect their data The Setup programs...

Page 6: ...ards or control cabinets When the instrument is in operation it must not be possible to touch the instrument terminals 3 2 Electrical connections The instrument is connected according to the wiring di...

Page 7: ...shown in Figure 1 on page 6 The two poles of the two wire bus are connected to terminals A and B attention being paid to the correct polarity while the shielding is connected to the terminal The A ter...

Page 8: ...ogether and shielded Types Manufacturer cable type order number cable Twinax 105 Lapp Unitronic Bus CAN 1x2x0 34 2170263 6 8 mm Helukabel CAN BUS 1x2x0 34 801572 6 5 mm Leoni L 02YSCY 1x2x0 34 2 0 120...

Page 9: ...e per second 4 3 Assigning an IP address The EMG 1500 PN requires a unique IP address before it can be accessed via the Ethernet The address is assigned using the software EMG SW supplied as part of t...

Page 10: ...there is at least one data collector of the type EMIS 1500 In addition a connection with this data collector must be in existence An additional bus coupler can be added by clicking the right mouse bu...

Page 11: ...Max Number of masters should not be changed and should remain set at 8 Important Each bus address may only be assigned once within a bus system For larger systems it is recommended to draw up a table...

Page 12: ...established with the EMG 1500 PN The Bus error LED indicates that there are bus related problems in the FRAKO Starkstrombus Each time this LED comes on it indicates that there has been an error in th...

Page 13: ...has not been adopted Switch the device off and then on again After the Ethernet cable has been plugged in the device cannot be accessed During device start up no Ethernet connection could be detected...

Page 14: ...lectrical connection as per EIA RS 485 Transmission rate 76 8 kbit sec Protocol FRAKO Starkstrombus Ethernet interface Plug RJ45 Transmission 10BaseT half duplex Mechanical design Enclosure material P...

Page 15: ...ta 15 EMG 1500 PN Energy Management System Run Made in Germany 140 0 mm 11 4 mm 5 0 mm 59 2 mm Gateway Serial Ethernet Connect Bus error Bus 44 8 mm 35 0 mm 90 0 mm 4 5 mm Figure 3 Enclosure dimension...

Page 16: ...e filters Dynamic compensation of harmonics Reactive power control relays Maximum demand control systems Mains monitoring instruments Cost allocation Energy management systems Sales programme EMG 1500...

Reviews: