T ECHNI CA L INST RUCT IO N
RAY- LG X 1X X
Page 12
RAY-LG x1xx Manual
Version: 20170524
Timing Diagram
Figure 13:
General timing diagram
Time
Value
Power up time
t1
max. 2,500
ms
Response time with
32 elements
t2
typ. 90 ms
max. 175 ms
Release time
t3
typ. 90 ms
max. 175 ms
Test response time
t4
max. 100 ms
Restart time
t5
max. 200 ms
OSE sequence time
t6
1 ms
Test time
t
7
>100 ms
Table 2:
General timing table
PNP
NPN
Power supply
USP
10 to 30 VDC
10 to 30
VDC
Power supply
GND
0 V
0 V
Test input HIGH
> 10 VDC
> 10 VDC
Test input LOW
< 2 VDC
< 2 VDC
Output HIGH
> USP - 2 VDC
high impe-
dance
Output LOW
high impe-
dance
< 2 VDC
Table 3:
General value table
Start-up
1.
Switch on main power supply and power up the door control unit. The LEDs blink during power up.
2.
Check the LED on both edges (power, status).
3.
Test if the system is working correctly by letting the door open and close, interrupting the light during
the opening and closing process.