FENCING INSTALLATION: VERSAI
Step 2:
Pour Concrete
1. Fill Posts holes with concrete to within 1” [25mm] of the
surface of soil. As shown in Fig. 1.
3. Use a level to confirm that corner post is plumb and that
the post is aligned with the Guide Strings.
Tip:
• Allow concrete to cure for a minimum of 24 hours before
installing brackets.
• As the concrete cures
, be sure to keep posts placed along
guide strings & continuously check that they are plumb as
well as in line with the next post.
POST INSTALLATION
Step 1:
Install Post
1. Confirm post hole depth.
2. Remove or add gravel to set post hole depth at 24”
[609mm].
3. Position post along guide string. As shown in Fig. 1.
Fig. 1
Fig. 1
Gravel
Concrete
Post
Ground Stake & Guide String
3” [72mm]
27” [685mm]
24” [609mm]
1” [25mm] Clearance