INSTRUCTIONS
Secure the Splitter Screen to the Right Cage
Next, secure the Splitter Screen to the Right Cage. Locate four more
self-tapping screws and tighten the screws using a power drill with
a 3/8” Socket. Fully tighten all screws.
4.
9
Drill the Anchor Bolt Holes
Attach the Wedge Anchor Bolts
Attach the Bottom Wedge Anchor Bolts
After securing the Splitter Screen to both cages, make sure the
screen is pushed back towards the front Baffle Wall. Next, locate
the pre drilled holes on the side plates and using a Rotary Hammer
Drill with a 3/8” Drill Bit drill the anchor bolt holes.
After drilling the holes, insert the provided 3/8” wedge anchor bolts
and fully tighten the anchor bolts using a Power Drill with a 9/16”
Socket.
Finally, locate the four mounting legs located on the bottom of the
Splitter Screen two on each side. Drill the anchor bolt holes using
a Rotary Hammer Drill with a 3/8” Drill Bit. After drilling the holes,
insert the provided 3/8” wedge anchor bolts, and fully tighten the
anchor bolts using a Power Drill with a 9/16” Socket.
6.
7.
5.
Secure the Splitter Screen to the Left Cage
Once the Splitter Screen is in place, locate the provided four self
tapping screws ( the amount of screws may be greater than four
for larger units see your project drawings). Tighten the four screws
using a power drill with a 3/8” Socket.
3.