INSTRUCTIONS
Fully Attach All the Remaining Anchors
Make sure you install one wedge anchor bolt at a time.
7.
Secure the Cage to the Back Baffle Wall
Place the Boom Cage up Against the Baffle Wall
1.
Step 2 - Installing the Skimmer Boom Cage Sub-Assemby
After Drilling the anchor bolt holes, secure the Boom Cage using the
provided 3/8” Dia. Wedge anchor bolts. Fully tighten the anchor
bolts using a Power Drill with a 9/16” Socket.
Begin step 2 by placing the Skimmer Boom Cage up against the
back Baffle Wall. Look at your project drawings to see how far down
to place the Cage. Locate the anchor bolt holes, and drill the holes
using a Rotary Hammer Drill with a 3/8” Dia. Drill bit.
2.
Repeat and install the Second Deflector Shield
Repeat the previous steps and attach the second Deflector Shield
on the remaining baffle wall. Repeat these steps For multiple Baffle
walls as required per your project drawings.
8.