background image

9     

_________________________________________________________________________________ 

3.2 Setting up the envelope sealing machine

   

 

1.

The Envelope Sealing Machine must be placed on a level and solid base. The
boxes must be placed on the surface.

2.

The Envelope Sealing Machine must be connected to a 115 vac grounded
outlet.

When setting up, the machine must always be turned off 
(the warning light must not be blinking!)
    

3.

The machine can be leveled by adjusting the two rear machine feet 

and

aligning the c

ircular 

bubble 

level on the basin.

4.

Check whether the circular level has moved. If necessary, adjust the
machine feet again.

5.

The transparent water reservoir must be filled with tap water. If the tank
were to tip over quickly the valve closes off the water.

In hard water areas add 4 to 5 drops of cleaning fluid.  This 
way you will have a equally smooth and spot-free liquid!  

6.

The moistening basin should be topped up

 

to the limit and the water

reservoir (neck down) inserted into this position inside the ring of the
moistening basin until the neck completely rests inside.

7.

The water must now reach the top of the moistening roller. Check for the
optimal wetness manually when turning the moistening roller.

8.

The correct amount of water will now automatically be supplied to
the moistening roller from the transparent water reservoir (vacuum
effect

.

)

The suction rubber pear is used to check the water level 
and to empty the moisture basin. 
 

When carrying out maintenance or moving the machine, the

wa

ter basin and reservoir must be completely emptied. 

9.

The moisture basin must be covered and the water reservoir 

bottle removed from

the ring-shaped holder

.

MyBinding.com

5500 NE Moore Court 

Hillsboro, OR 97124 

Toll Free: 1-800-944-4573 

Local: 503-640-5920

Summary of Contents for FD 430

Page 1: ...FD 430 Envelope Sealer OPERATOR MAINTENANCE PARTS MANUAL REV 1 5 2017 MyBinding com 5500 NE Moore Court Hillsboro OR 97124 Toll Free 1 800 944 4573 Local 503 640 5920...

Page 2: ...2 MyBinding com 5500 NE Moore Court Hillsboro OR 97124 Toll Free 1 800 944 4573 Local 503 640 5920...

Page 3: ...NSTRUCTION FOR USE 11 4 1 Standard use 11 4 2 Settings for different letter thicknesses 12 4 3 Setting up and regulating the basin 12 4 4 Regulating the moistening of the envelope flap 15 4 5 Setting...

Page 4: ..._________________________________________________________________ 6 SPARE PARTS 20 7 PART DIAGRAM 22 8 TECHNICAL DATA 23 MyBinding com 5500 NE Moore Court Hillsboro OR 97124 Toll Free 1 800 944 4573 L...

Page 5: ...tructions have not been followed serious harm to the body can be caused This means there is a potentially dangerous situation When the instructions have not been followed serious harm to the body can...

Page 6: ...Envelope Sealer safely The instructions and especially the safety precautions should be followed by all who use the Envelope Sealer The operating instructions must always be kept near the Envelope Sea...

Page 7: ...below 50 F or over 120 F in areas containing highly flammable material in areas with explosive material in very dirty or dusty environments in corrosive environments e g where the air has a high salt...

Page 8: ...ion of functions A large water reservoir with a controlled water level and automatic level regulator ensure there is a smooth supply of water to the moistening tank The moistening roller is self clean...

Page 9: ...s add 4 to 5 drops of cleaning fluid This way you will have a equally smooth and spot free liquid 6 The moistening basin should be topped up to the limit and the water reservoir neck down inserted int...

Page 10: ...tric power cannot come into contact 11 Guide the infeed tray support pins into the receptacles and tighten both thumbscrews 3 3 Power supply The operating voltage required is as specified below 100 12...

Page 11: ...the same side The infeed tray should be positioned with an additional 2mm space around the edge of the envelope and for longer formats they should open to the left Place the envelope pile in the outfe...

Page 12: ...d regulating the basin The correct water level for the moistening rollers is controlled by circular bubble level on the moisture basin by raising or lowering the two rear machine feet Once the water r...

Page 13: ...ted envelopes Normally stacked envelopes direction of processing direction of processing Picture 1 Picture 2 MyBinding com 5500 NE Moore Court Hillsboro OR 97124 Toll Free 1 800 944 4573 Local 503 640...

Page 14: ...mm Up to 8 mm Loosen knurled nut slightly and shift the feed separator plate unit to the upper position or slide down to the lower position Fix the knurled nut again and align the spring plate on the...

Page 15: ...turn clockwise results in a lighter wetting a quarter turn counterclockwise results in a stronger wetting The ideal speed can be adjusted with the rotary knob adjustment from 0 100 range 0 10 Dependin...

Page 16: ...o the rocker switch black with on off switch and fuse holder Cleaning and maintenance work Damage to the power cable to be replaced immediately Short circuit or other electical faults an authorised re...

Page 17: ...l slightly forward remove the left side cover or in IR plate tilt to the left hanging with IR sensor on the cable 8 Remove body screws plus body discs completely M6x16 from the front panel and pull th...

Page 18: ...ng on the degree of wear these rubber rings of the conveyor rollers should be replaced regularly Always replace all 5 rubber rings at the same time These rubber rings can be easily removed by hand by...

Page 19: ...sm is basically maintenance free The drive has automatic belt tension and a safety clutch If the motor drive mechanism is defective the motor or the conveyor rubber belt needs to be replaced Consult a...

Page 20: ...d fuse holder 1 527 Permanent DC motor 24VDC 5000 RPM single worm gear 10 1 900 Ncm without pulley 1 529 PWM DC Power Controller 9 28V 10A max 1 530 150W Single Output Switching Power Supply V out 24V...

Page 21: ...ning basin arm w long moistening roller and complete shaft 553 Flap feeding roller Partition Wall 555 Conveyor roller complete with shaft and rubber ring 257 604 Moistening basin arm w short moistenin...

Page 22: ...capacity C5 C5 6 18 000 envelopes per hour Licensing CE Accessories incl Cover suction rubber pear replacement fuse instruction manual Position of basin two stage adjustable for envelopes from 0 8mm a...

Reviews: