background image

Assembly

STEP 9:

If your barrow was purchased 
without a tub or the tub was 
packaged separately then it 
will be necessary to join the 
two halves of the lifting ring. 
Insert the ends of the ring 
half (17) into the connecting 
tubes of ring half (16) and 
secure with the self tapping 
screws (18). The ends of the 
half ring (17) are pre-drilled 
for the screws.

STEP 10:

Insert one of the lifting 
ring pivot tubes into one 
of the fork top tubes then 
compress the ring and 
insert the opposite pivot 
tube into the opposite 
fork top tube.

Zero Barrow

9

Summary of Contents for ZERO BARROW

Page 1: ...No Strain Self Levelling Barrow IMPORTANT Read this manual fully before assembly and use and observe all safety rules and operating instructions ZERO BARROWPatented...

Page 2: ...ram 3 Parts List 4 Assembly 5 Operation 11 Safety 14 Warranty 15 2 Technical Specification Length 1400 mm 55 ins Width 710 mm 28 ins Height excluding tub 650 mm 26 ins Weight excluding tub 14 kg 31 lb...

Page 3: ...Zero Barrow 3 Exploded Diagram 1 2 3 4 5 17 16 6 7 8 9 10 11 12 13 14 15 18 2 9...

Page 4: ...3 M8 hand wheel 4 4 25 mm handle tube 2 5 Hand grip 2 6 Brace 2 7 Sleeve 1 8 M6 flange nut 6 9 M6 x 40 cap head bolt 2 10 Fork 2 11 M12 axle bolt 2 12 Wheel 2 13 M12 plain washer 6 14 Axle 1 15 M6 x 5...

Page 5: ...e bolt head is a flush fit STEP 2 Insert one end of the axle 14 into the inner guide and locate on the axle bolt Screw in but do not fully tighten the axle bolt using an Allen key Ensure that the hole...

Page 6: ...ough the locating tube and the handle tube Secure with an M6 flange nut 8 Note that the head of the cap head bolt should sit inside the large hole in the locating tube See note on Page 7 STEP 3 Repeat...

Page 7: ...In addition the larger of the two holes at the other end should be orient ed to the outside of the handle STEP 5 Repeat for the other 30 mm handle tube and fork STEP 6 Insert each of the 25 mm diamete...

Page 8: ...l 3 into the nut on top of each brace top tube and tighten to secure the brace STEP 7 Insert a brace 6 into one end of the sleeve 7 and secure with an M6 x 35 cap head bolt 2 and M6 nut 8 Note the lar...

Page 9: ...sert the ends of the ring half 17 into the connecting tubes of ring half 16 and secure with the self tapping screws 18 The ends of the half ring 17 are pre drilled for the screws STEP 10 Insert one of...

Page 10: ...11 Screw the two remaining M8 handwheels 3 into the nuts on the top of the fork top tubes but do not tighten STEP 12 Push a handgrip 5 over the end of each of the 25 mm handle tubes Ensure they are f...

Page 11: ...t of the ring so it sits within the ring STEP 1 Position the barrow behind the tub with the handles tipped forward so that the ring sits on the ground NOTE The M8 handwheels on top of the forks should...

Page 12: ...o that the tub is over the axle NOTE To lower a tub to the ground place a foot on the axle and lift the handles up and forward to lower the ring to the ground It is important to place a foot on the ax...

Page 13: ...ds the tub can be tipped from behind while still holding the bar row With heavier loads the brace can be rested on the ground and the tub tipped from the side using two hands It is also possible to ti...

Page 14: ...check that all nuts and bolts are secure and that the barrow is not damaged Check that the tyres are evenly inflated to a suitable pressure for the load you are carrying Do not exceed the maximum pres...

Page 15: ...e stated warranty period return it to the store with proof of purchase and it will be replaced or repaired free of charge Should this product become defective contact the store where it was purchased...

Page 16: ...ht to alter data specifications and component parts without prior notice Manufactured under license for Forest Master Limited Registered Office Forest Master Ltd Industry Road Heaton Newcastle Upon Ty...

Reviews: