background image

 

General information for the installer, maintenance technicians and users  

page  2

1.  Instructions for the user  

page  4

1.1. Control panel  

page  4

1.2. Operating the boiler  

page  5

 

1.2.1. 

Switching on  

page  5

 

1.2.2. 

Operation 

page  5

 

 

1.2.2.1. AQUA PREMIUM system 

page  5

 

 

1.2.2.2. Instantaneous DHW production 

page  5

 

 

1.2.2.3. Thermal unit managing one high temperature CH area and DHW supply 

page  5

 

 

1.2.2.4. Thermal unit managing one mixed water CH area, one high temperature CH area and DHW supply (V version) 

page  6 

 

 

1.2.2.5. Anti-Legionella function 

page  7

 

 

1.2.2.6. Pump anti-seizure function 

page  7

 

 

1.2.2.7. Phone operation function 

page  7

 

1.2.3. 

Electronic programmer setup 

page  7

 

1.2.4. 

Boiler shutdown  

page  8

 

1.2.5. 

Burner shutdown 

page  8

 

1.2.6. 

Shutdown due to overheating 

page  8

 

1.2.7. 

Shutdown due to air/flue gas system malfunction 

page  8

 

1.2.8. 

Shutdown due to insufficient water pressure 

page  9

 

1.2.9. 

Shutdown due to malfunction of temperature probes 

page  9

1.3. Maintenance  

page  9

1.4. Information for the user  

page  9

2.  Technical characteristics and dimensions  

page 10

2.1. Technical characteristics 

page 10

2.2. Dimensions  

page 10

2.3. Boiler layout 

page 12 

2.4. Operational data 

page 13

3.  Instructions for the fitter  

page 14

3.1. Installation standards 

page 14

3.2. Installation  

page 14

 

3.2.1. Packaging  

page 14

 

3.2.2. Choosing where to install the boiler  

page 14

 

3.2.3. Positioning the boiler  

page 14

 

3.2.4. Boiler room ventilation 

page 15

 

3.2.5. Air/flue gas system configuration 

page 15

 

3.2.6. Verifying combustion efficiency 

page 17

 

3.2.7. Gas main connection 

page 17

 

3.2.8. Power main connection 

page 17

 

3.2.9. Hydraulic connections 

page 17

 

3.2.10. Room thermostat connection 

page 17

 

3.2.11. Adjustable by-pass  

page 17

 

3.2.12. Installation of original kits 

page 18

3.3. Loading the system  

page 18

3.4. Starting the boiler  

page 18

 

3.4.1. 

Preliminary checks  

page 18

 

3.4.2. 

On/off switching 

page 18

3.5. Wiring diagram  

page 19

3.6. Switching to different gas and burner adjustment 

page 21

4.  Maintenance  

page 21

5.  Troubleshooting   

page 22

TABLE OF CONTENTS

3

Summary of Contents for BALI B BTFSE 24

Page 1: ...IST 03 C 192 01 INSTALLATION USE AND MAINTENANCE BALI B BTNE 25 BTNE 32 BTNE 42 BTFSE 24 BTFSE 32 BTFSE 36 GB...

Page 2: ...Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly 1...

Page 3: ...ment sites Keep the packaging out of the reach of children as by its nature it may represent a hazard In the event of failure and or faulty functioning switch off the boiler Do not attempt to repair i...

Page 4: ...of temperature probes page 9 1 3 Maintenance page 9 1 4 Information for the user page 9 2 Technical characteristics and dimensions page 10 2 1 Technical characteristics page 10 2 2 Dimensions page 10...

Page 5: ...operates in CH and instantaneous DHW supply mode only As soon as the probe is replaced the boiler will resume operation 8 Indication light red when the light is on and fixed it indicates that the temp...

Page 6: ...liters per minute relies upon the boiler thermal output and water main supply temperature according to the fol lowing formula l DHW in liters per minute K T K represents 344 for BTFS 24 model 459 for...

Page 7: ...t when the boiler is equipped with an external temperature probe the user sets a fictitious room temperature va lue via knob 13 please see SLIDING TEMPERATURE OPERA TION section Knob 13 is used to adj...

Page 8: ...of the week current time ON and OFF pro grams please see below sections B and C B Setting the day of the week and current time Position selector 2 to RUN and press h and m buttons at the same time unt...

Page 9: ...will be displayed fixed and symbol will be displayed indicator 4 now the chan nel will be permanently active Rapidly set selector 1 to position O without stopping in position AUTO press once or twice...

Page 10: ...usehold products Do not use water As provided by law the boiler is to be serviced once a year Correct maintenance ensures boiler to function efficiently environmentally friendly preventing any danger...

Page 11: ...aracteristics High output cast iron heat exchanger Stainless steel plate DHW heat exchanger Stainless steel horizontal stratification 60 l water tank with sacrificial magnesium anode Glass wool alumin...

Page 12: ...inlet C DHW flow F Cold water inlet M CH flow R CH return G Gas inlet C DHW flow F Cold water inlet M CH flow R CH return M1 Low temperature zone flow M2 Low temperature zone return D Flue gas outlet...

Page 13: ...CAST HEAT EXCHANGER BURNER Plate heat exchanger probe Zone 1 high temperature Thermostatic valve DHW Cold water inlet Water tank probe Water tank VM 2 way Cold water inlet Zone 1 high temperature Zon...

Page 14: ...16 4 Water tank capacity l 60 60 60 60 60 60 DHW supply T 30K EN 625 l 10 220 242 280 215 245 253 prEN 13203 efficiency rating Min DHW flow rate l min 3 3 3 3 3 3 Min DHW pressure bar 1 1 1 1 1 1 Max...

Page 15: ...manual Four legs with threads 3 2 2 Choosing where to install the boiler When choosing where to install the boiler follow the instructions below indications in paragraph 3 2 5 Air flue gas system conf...

Page 16: ...lination toward the ground of at least 5 The terminal is to ensure efficient constant evacuation of flue gas in any weather condition The flue gas terminal is to stand at least 0 5 m above any adjacen...

Page 17: ...0 mm diameter split pipes Roof mounted flue gas terminal Allowable configuration for max length of split pipes 2 flanged stub pipes 1 meter long air intake pipe 30 meter long flue gas pipe 1 air intak...

Page 18: ...damage or injury cau sed by failure to properly earth the power main Gas lines DHW and CH pipes are not suitable for earthing purpo ses 3 2 9 Hydraulic connections Before connecting the boiler it is a...

Page 19: ...through water mains inlet tap on the boiler as necessary Water pressure adjustment must be performed when the system is cold The thermo manometer gauge on the boiler allows for che cking the pressure...

Page 20: ...er P3 boiler operating mode selector P2 DHW temperature adjusting potentiometer P1 CH temperature adjusting potentiometer IG two poled main power switch BC flame detection pcb VG gas valve E RIV flame...

Page 21: ...NECTION M1 M24 AVAILABLE CONNECTORS X1 X8 AVAILABLE CONNECTORS CT PHONE CONNECTION DEVICE OPTIONAL EQUIPMENT FUSE SP 2 AF 250 Vac FUSE FUSE SZ 2 5 AF 250 Vac FUSE P4 HIGH TEMPERATURE CH CURVES ADJUSTI...

Page 22: ...ted by qualified personnel In order to verify nozzle and gas inlet pressure connect a mano meter to checks on the gas valve Boilers are factory set according to gas type requested upon order Any later...

Page 23: ...the plate heat exchanger The boiler has shut down and red light no 4 is flashing Restore correct water pressure Insufficient water pressure Possible water leaks Check system for leaks Pressure switch...

Page 24: ...has not sufficient pressu re or flow rate Check DHW system Check flow meter filter Flow meter sensor is faulty or discon nected Replace or reconnect it Flow meter is blocked Replace it Burner does not...

Page 25: ...24...

Page 26: ...25...

Page 27: ...26...

Page 28: ...ax 39 0365 878 576 e mail fondital fondital it www fondital it The MANUFACTURER reserves the right to implement any necessary and or useful variation to products without modifying fundamental characte...

Reviews: