5
EN
Model assembly
Vertical stabilizer installation
Vertical Stabilizer Installation
Missiles and Oil Tank Installation
1.Slide the missiles and oil tank into the rails.
1.Slide the vertical tail into the slot in the fuselage.
Note:
Connect the rudder servo connectors to the servo extensions in the fuselage.
2.Secure the vertical tail in place using the included screws.
Scale Part Installation
1.Carefully apply CA to the base and side of the pocket as
shown.
2.Carefully place the plastic part into the pocket.
Summary of Contents for EDF Jet 70mm F-18F V2 PNP
Page 12: ......
Page 23: ......
Page 34: ......
Page 35: ...3 8 3 85V 4 5 48 5 3V 32...
Page 37: ...34 2 1 2 1...
Page 38: ...35 Vertical stabilizer installation 1 1 2 1 2...
Page 41: ...38 1 60 70mm 2 1 2 3 4 5 2 3 60 70mm...
Page 43: ...40 1 2 3 4...
Page 44: ......