www.fmiproducts.com
115254-01C
16
Propane/LP
Supply Tank
4. Check all joints from equipment shutoff
valve to control valve (Manually-Con
-
trolled Models) or to gas control (Remote-
Ready Models) (see Figures 16 and 17).
Apply noncorrosive leak detection fluid to
all joints. Bubbles forming show a leak.
5. Correct all leaks at once.
6. Light heater (see
Operation,
page 19).
Check all other internal joints for leaks.
7. Turn off heater (see
To Turn Off Gas to Ap-
pliance
, page 20 for Manually-Controlled
Models or page 23 for Remote-Ready
Models).
INSTALLATION
Continued
Equipment
Shutoff Valve
Figure 17 - Checking Gas Joints
(Natural Gas Only)
Figure 16 - Checking Gas Joints
(Propane/LP Gas Only)
Equipment Shutoff Valve
Gas
Meter
Control Valve Location
Control Valve Location
INSTALLING LOGS
(Models (V)L32HN, (V)L32LHN. (V)
L32HP and (V)L32LHP
WARNING: Failure to posi-
tion the parts in accordance
with these diagrams or failure
to use only parts specifically
approved with this heater may
result in property damage or
personal injury.
CAUTION: After installa-
tion and periodically thereafter,
check to ensure that no flame
comes in contact with any log.
With the heater set to HI, check
to see if flames contact any log. If
so, reposition logs according to
the log installation instructions
in this manual. Flames contact-
ing logs will create soot.
Vintage Oak Two-Piece Log Set
It is very important to install these logs exactly
as instructed. Do not modify logs. Only use
logs supplied with heater.
1. Place front log on top of grate and over
front posts on chassis (see Figure 18).
2. Place rear log on rear of chassis (see
Figure 18). Slide log forward so that it sits
against rear posts on chassis.
Front Post
Figure 18 - Installing Vintage Oak Two-
Piece Log Set
Log #2
Chassis
Rear
Post
Log #1