Set Up a Project
Refer to the
PROJECT
screen in Figure 28 on page 77.
1
On the home screen, tap the
PROJECT
panel, tap
CHANGE
PROJECT
, then tap
NEW PROJECT
.
2
On the
NEW PROJECT
screen, enter a name for the project,
then tap
DONE
.
3
On the
PROJECT
screen, tap the
Operator
panel to enter an
operator name for the project.
4
On the
PROJECT
screen, tap the
NEW TEST
button to enter
the tests and test settings necessary for the project.
5
On the
PROJECT
screen, tap the
NEW ID SET
button to make
one or more sets of cable IDs for the project. See the
CABLE ID
SETUP
screen in Figure 29 on page 79.
6
On the
PROJECT
screen, tap
DONE
.
The PROJECT Screen
To start a new project, tap the
PROJECT
panel on the screen.
Figure 28 shows the
PROJECT
screen and describes the items you
enter to make a project.
The name of the project. See also item
.
Operator
: The name of the person who will do the tests for the
project. For each operator you can also enter the email address
that the operator will use as an ID to sign in to LinkWare Live.
The date range for the results in the project.
Results
: A summary of the test results in the project:
: The number of tests that failed.
: The number of tests that passed.