background image

(back)

(freezer back)

(side view)

Remove the side service panel nearest the connection.

10

9

Reinstall the front service panel with the connector 
securely in place and tubing to the inside. Ensure the 
cable falls against the panel and under the support bar so 
that it does not interfere with any internal freezer parts.

ADPT TY80S-FCB2   FCB Auto Draw Valve Conversion Kit

REV021313

pg. 3 of 6

Angle the uppger bracket lip up through the 3rd vent slot 
from the bottom, so that the lower bracket lip can slide 
into the bottom vent slot. Slide the bracket down as far as 
it will go.

14

Install the cable mounting plate assembly on the same 
side as the Auto Draw Valve Assembly.  Slide the spade 
connector ends of the cables through the 2nd slot from 
the bottom of the freezer’s back vent cover. 

13

Connect the air tube to the B port on the valve.  Use the 
tubing sleeves to secure the tube on the barb connection.

12

11

Install the Valve Assembly inside the freezer cabinet using 
the screw provided. Mount the base housing to the 
existing bracket as shown.

Reviews: