(back)
(freezer back)
(side view)
Remove the side service panel nearest the connection.
10
9
Reinstall the front service panel with the connector
securely in place and tubing to the inside. Ensure the
cable falls against the panel and under the support bar so
that it does not interfere with any internal freezer parts.
ADPT TY80S-FCB2 FCB Auto Draw Valve Conversion Kit
REV021313
pg. 3 of 6
Angle the uppger bracket lip up through the 3rd vent slot
from the bottom, so that the lower bracket lip can slide
into the bottom vent slot. Slide the bracket down as far as
it will go.
14
Install the cable mounting plate assembly on the same
side as the Auto Draw Valve Assembly. Slide the spade
connector ends of the cables through the 2nd slot from
the bottom of the freezer’s back vent cover.
13
Connect the air tube to the B port on the valve. Use the
tubing sleeves to secure the tube on the barb connection.
12
11
Install the Valve Assembly inside the freezer cabinet using
the screw provided. Mount the base housing to the
existing bracket as shown.