SECTION 2
INSTALLATION OF FIRE
2.1
UNPACKING THE FIRE
Carefully lift the fire out of the carton. Remove the loose item packaging carefully
from the front of the appliance. Check the contents as listed :-
Packing Check List - Coal Fuelbed Models
1off
Fire box / burner assembly
1off
Boxed ceramic base and 7 synthetic coals
1off
Loose items bag.
1off
Trim (3 piece or 1 piece dependent upon model chosen)
1off
Boxed Fret & Ashpan cover (dependent upon model chosen)
1off each Installation / User book (Combined)
Packing Check List - Pebble & Driftwood Fuelbed Models
1off
Fire box / burner assembly
1off
Boxed ceramic base and 7 synthetic pebbles (4 large, 3 small) or
driftwood pieces
1off
Loose items bag.
1off
Chrome Effect Trim / Ashpan
1off each Installation / User book (Combined)
2.2
INSTALLING THE FIRE BOX
Establish which type of flue you are intending to install the fire in to :-
225 x 225mm (9 inch x 9 inch) brick built chimneys
175mm (7 inch) diameter lined brick or stone flue, or insulated pre-fabricated
metal flue box to B.S. 715.
When installing into 125mm (5 inch) diameter lined brick or stone flue, or
insulated pre-fabricated metal flue box to B.S. 715 and pre-cast flues the
restrictor baffle must not be fitted.
A spillage test must always be carried out to check satisfactory
clearance of flue products, regardless of the type of flue the
appliance is being fitted to.