
EN
EN
10
4 INFLATING AND SETTING UP
NOTE!
Tighten the valves before inflating!
Valve and pump operation
1. The valves must be closed when inflating: the
button in the middle is in up position. By pressing
the button you can open/close the valve. Button
down = valve open, button up = valve closed.
2. The FitNord pump is a Double Action Pump.
Initially, you can keep the plug closed allowing the
pump to push air into the board during both the
pulling and pushing phases. When the pressure
rises and the pumping becomes heavier, open
the plug which makes the pumping easier (single
action mode).
All
three
valves must be tightened before the first
inflation. If the valve is loose, air will leak from the
outer edges of the valve and the kayak will deflate.
Tighten the valve with the wrench tool included in
the repair kit. Note that the kayak must be empty
when tightening. Insert the wrench into the slots
around the valve, press all the way down and
tighten firmly clockwise.
Summary of Contents for Seal One
Page 2: ...REGARDS FROM THE FITNORD TEAM CONGRATULATIONS ON PURCHASING A FITNORD KAYAK ...
Page 4: ...EN ...
Page 18: ...DAS FITNORD TEAM WIR GRATULIEREN SIE FÜR DEN EINKAUF UNSERES KAJAKS ...
Page 20: ...DE ...
Page 35: ...DE 35 ...
Page 36: ...CORDIALEMENT L ÉQUIPE FITNORD MERCI D AVOIR CHOISI UNE KAYAK FITNORD ...
Page 38: ...FR ...
Page 52: ...I MIGLIORI SALUTI DAL TEAM FITNORD CONGRATULAZIONI PER L ACQUISTO DI UN KAYAK FITNORD ...
Page 54: ...IT ...
Page 68: ...SALUDOS DEL EQUIPO DE FITNORD FELICITACIONES POR LA COMPRA DE UN KAYAK DE FITNORD ...
Page 70: ...ES ...
Page 84: ...SE ...