15
STEP 6
1. The vertical support tube (A14) is installed into vertical frame 1 (A7). Use 4 washers (B17), 2
Screw bolts (B4) and 2 nuts (B13).
2. The pulley support (D3) need to be installed near the top of vertical frame 1 (A7). Use 3
washers (B17), 1 screw bolt (B5) and 4 nuts (B13).
3. Then install the backrest pad (E28) onto vertical frame 1 (A7). To connect these together you
will need to use 2 washers (B18) and 2 screw bolts (F1).
ASSEMBLY INSTRUCTIONS
Summary of Contents for TF-7005A
Page 5: ...5 PARTS LIST...
Page 6: ...6 PARTS LIST...
Page 7: ...7 PARTS LIST...
Page 8: ...8 PARTS LIST...
Page 9: ...9 PARTS LIST...
Page 18: ...18 ASSEMBLY INSTRUCTIONS...
Page 19: ...19 ASSEMBLY INSTRUCTIONS...
Page 20: ...20 ASSEMBLY INSTRUCTIONS...
Page 28: ...28...