9
ASSEMBLY INSTRUCTIONS
STEP 1
1. Attach an Upright(1)to the Stabilizer(2)with M10 x 50L Bolts(14), two M10 Washers(23
and M10 Nylon Locknuts(27). Do not tighten the Locknuts.Repeat this step with the other
Upright(1).
2. Attach the connecting pipe(3)the weight pipe(1)with two M10x55L Bolts(15), four M10
Washers(23)and two M8 Nylon Locknuts(27). Do not tighten the Locknuts.In the same install
other side of the connecting pipe(3).
3. Attach the Bench frame(4)the connection pipe(3), With rivet(41), one M10x55L.Bolts(15)two
M10 Washers(23)and two M10 Nylon Locknuts (27).Do not tighten the Locknuts.
4. Attach the front pad(5) into the Bench frame(4) and tighten them with three M8x15L Bolts(20)
and three M8 Washers(24). Make sure that the bolt heads fit inside the hexagonal holes in the
Bench Frame. Do not tighten the Locknuts.